            CNC高壓清洗機在作業(yè)前后的安全要求

            作者:admin來源:http://www.chendakeji.cn/時間:2023-03-17

            (1)、作業(yè)前準(zhǔn)備
            (1) Preparation before operation
            ①、檢查CNC高壓清洗機附件,看是否有松動情況
            ① Check the accessories of the CNC high-pressure cleaning machine for looseness
            ②、檢查進(jìn)水口管路連接,確保水路暢通。
            ② Check the connection of the water inlet pipeline to ensure that the waterway is smooth.
            ③、檢查并確認(rèn)CNC高壓清洗機控制面板的主開關(guān)切換在“停”的位置。
            ③ Check and confirm that the main switch on the control panel of the CNC high-pressure cleaning machine is switched to the "Stop" position.
            ④、檢查進(jìn)行主電源接線并接線正確。
            ④ Check that the main power supply wiring is correct.
            ⑤、檢查打開進(jìn)水管閥門,確保無泄漏。
            ⑤ Check and open the water inlet pipe valve to ensure there is no leakage.
            (2)、作業(yè)過程中安全注意事項
            (2) Safety precautions during operation
            ①、嚴(yán)禁將清洗噴槍指向人、動物、精密機械、電器設(shè)備、CNC高壓清洗機本體、有害物質(zhì),避免有害物質(zhì)飛濺傷
            ① It is strictly prohibited to point the cleaning spray gun at people, animals, precision machinery, electrical equipment, CNC high-pressure cleaning machine body, and hazardous substances to avoid splashing injuries caused by hazardous substances
            ②、嚴(yán)禁使用CNC高壓清洗機進(jìn)行沖洗衣物、鞋等與工作內(nèi)容無關(guān)的操作。
            ② It is strictly prohibited to use CNC high-pressure washing machines to wash clothes, shoes, and other operations unrelated to the work content.
            CNC高壓清洗機
            ③、CNC高壓清洗機停止使用時,控制面板主開關(guān)須切換到“停”的位置并斷開主電源。CNC高壓清洗機嚴(yán)禁離人使用
            ③ When the CNC high-pressure cleaning machine is stopped, the main switch on the control panel must be switched to the "Stop" position and the main power supply disconnected. CNC high-pressure cleaning machine is strictly prohibited from use
            ⑤、嚴(yán)禁在CNC高壓清洗機作業(yè)時移動CNC高壓清洗機,若想移動,必在必在主電源斷電后或控制面板主開關(guān)切換到“停”的位置后進(jìn)行。
            ⑤ It is strictly prohibited to move the CNC high-pressure cleaning machine during operation. If you want to move the CNC high-pressure cleaning machine, you must do so after the main power supply is powered off or the main switch on the control panel is switched to the "Stop" position.
            ⑥、使用CNC高壓清洗機時必確保地面干燥、平坦,防止CNC高壓清洗機翻倒以及CNC高壓清洗機漏電傷人,同時必確保旋轉(zhuǎn)輪閘已被剎住。
            ⑥ When using the CNC high-pressure cleaning machine, it is necessary to ensure that the ground is dry and flat, to prevent the CNC high-pressure cleaning machine from overturning and electric leakage of the CNC high-pressure cleaning machine, and to ensure that the rotary wheel brake has been stopped.
            ⑦、使用CNC高壓清洗機時雙手必緊握高壓清洗槍,防止高壓反沖力導(dǎo)致的清洗噴槍脫手或清洗噴槍失控等不安全情況的發(fā)生。
            ⑦ When using the CNC high-pressure cleaning machine, both hands must hold the high-pressure cleaning gun tightly to prevent unsafe situations such as the release of the cleaning gun or the loss of control of the cleaning gun caused by the high-pressure recoil force.
            ⑧、CNC高壓清洗機的修護工作必在CNC高壓清洗機斷開主電源后并完全冷卻后進(jìn)行。
            ⑧ The maintenance work of the CNC high-pressure cleaning machine must be carried out after the main power supply of the CNC high-pressure cleaning machine is disconnected and completely cooled.
            ⑨、進(jìn)行清洗時嚴(yán)禁用清洗噴槍上的安全鎖定扭將清洗噴槍扣機鎖定在打開位置。
            ⑨ During cleaning, it is strictly prohibited to use the safety locking knob on the cleaning spray gun to lock the cleaning spray gun buckle in the open position.
            ⑩、當(dāng)扣動清洗噴槍扣機無水噴出時,嚴(yán)禁人員湊近清洗噴槍進(jìn)行處理。
            ⑩ When the cleaning spray gun is turned on and there is no water spraying from the machine, it is strictly prohibited for personnel to approach the cleaning spray gun for treatment.
            (3)、工作完成后的注意事項
            (3) Precautions after completing the work
            ①、工作完畢后,離開機器前,主電源電線盤起收好。
            ① After completing the work and before leaving the machine, the main power cord should be coiled up and put away.
            ②、關(guān)閉進(jìn)水,拆除進(jìn)水口管路。
            ② Close the water inlet and remove the water inlet pipeline.
            ③、扣動清洗噴槍扣機清空余水。
            ③ Press the cleaning spray gun to empty the residual water.
            ④、將高壓清洗管盤起,收好,避免折
            ④ Coil up the high-pressure cleaning tube and put it away to avoid folding
            ⑤、將CNC高壓清洗機存放在干凈干燥的地方,并確保高壓清洗管及主電源電線不受損壞。
            ⑤ Store the CNC high-pressure cleaning machine in a clean and dry place, and ensure that the high-pressure cleaning tube and main power cord are not damaged.
            CNC高壓清洗機在作業(yè)前后的安全要求就講解到這里了,您對此有怎樣的需求或者使用疑惑,歡迎來我們網(wǎng)站http://www.chendakeji.cn咨詢!
            That's all about the safety requirements for CNC high-pressure cleaning machines before and after operation. If you have any requirements or doubts about using them, please come to our website http://www.chendakeji.cn consulting service
            主站蜘蛛池模板: 久久婷婷国产精品香蕉| 女人被弄到高潮的免费视频| 国产色青青视频在线观看撒| 青草视频在线观看入口| 国产精品99精品无码视亚| 国产成人亚洲精品无码青app| 99久久99久久精品免费看蜜桃| 性开放的欧美大片| 国产毛片女人高潮叫声| 国产成人无码免费视频麻豆| 色婷婷综合激情综在线播放| 中字无码av在线电影| 波多结野衣一区二区三区| 国精品无码人妻一区二区三区| 成码无人av片在线电影网站| 中文字幕国产精品综合| 麻豆果冻传媒精品| 国内精品免费久久久久软件| 亚洲精品国产aⅴ成拍色拍 | 无码av免费永久免费永久专区 | 伊人久久精品一区二区三区| 亚洲另类自拍丝袜第五页| 亚洲色大成网站WWW永久麻豆| 国产在线视欧美亚综合| 欧美激情一区二区三区| 熟妇人妻引诱中文字幕| 欲色欲色天天天www| 97夜夜澡人人爽人人喊中国片 | 国产99视频精品专区| 欧美人与动牲交A免费观看| 亚洲国产视频精品一区二区| 成人毛片无码免费播放网站| 亚洲欧美人成电影在线观看| 四虎成人精品在永久免费| 久久久无码人妻精品一区| 粉嫩萝控精品福利网站| 国产视频最新| 少妇熟女高潮流白浆| 色偷偷尼玛图亚洲综合| 国产一卡2卡三卡4卡免费网站| 精品国产18久久久久久|